Skip to content

Factory Physics and Automation blog

to share and discuss experiences in the field of semiconductor manufacturing operations and automation

Importance of carrier location tracking – part 2

April 23, 2025May 2, 2025 Leave a comment

This post will be all about the advantages and capabilities of RFID based carrier tracking. But before I dive into this – here are the results from the poll from part 1: Based on this more than half of the legacy FABs have no complete location tracking of all carries in place. In my opinion…… Continue reading Importance of carrier location tracking – part 2

Innovation Forum for Automation 2025

February 8, 2025May 2, 2025 Leave a comment

To make it short: We had a blast ! The 22nd edition of the conference took place in Dresden, Germany last week and I had the honor to play an active part. Together with a few of my colleagues from Fabmatics Germany we hosted the break out session Test Wafers – the hidden GEMS in…… Continue reading Innovation Forum for Automation 2025

Posts pagination

Previous page Page 1 … Page 3 Page 4 Page 5 … Page 24 Next page
  • Humanoids in Wafer FABs – poll results
  • Humanoid Robots in Wafer FABs ?
  • Maintenance in the era of Industry 4.0
  • Legacy FAB Automation Maturity Framework
  • Results of FAB Automation 2025 survey
  • State of Semiconductor FAB automation in 2025
  • Importance of carrier location tracking – part 2
  • Innovation Forum for Automation 2025
  • Good Bye 2024 – Hello 2025 !
  • AI enabled precision maintenance
  • Importance of carrier location tracking – part 1
  • Test Wafer, part 3
  • Test Wafer, part 2
  • Test Wafer , part 1
  • ASMC 2024
  • THANK YOU 2023
  • Maintenance and FAB productivity
  • Impact of “time links” or controlled queue times
  • MES & Industry 4.0 Summit in Porto, Portugal
  • ASMC 2024 – call for papers
  • MES Summit in Porto, Portugal
  • 2024 Innovation Forum for Automation
  • Data is the new oil – or is it skilled workforce ?
  • ASMC 2023
  • Product Mix and FAB performance
  • Rework and FAB cycle time
  • Equipment Uptime and FAB speed, part 3
  • Equipment Uptime and FAB speed, part 2
  • Equipment Uptime and FAB speed, part 1
  • Summertime (Blog) Blues
  • 19th Innovation Forum for Automation
  • Wafer FABs – how many are there ?
  • Fab cycle time and capacity planning
  • US Semiconductor Ecosystem Outlook
  • View into a FAB
  • Equipment load port utilization vs. FAB speed
  • Wafer FAB – size does matter !
  • The value of 1 day of factory cycle time
  • Chip shortage and FAB performance, part 3
  • Chip shortage and FAB performance, part 2
  • Chip shortage and FAB performance, part 1
  • Bottlenecks – download
  • Bottlenecks, final part
  • Bottlenecks, part 3
  • Bottlenecks, part 2
  • Bottlenecks, part 1
  • Hello
A WordPress.com Website. Factory Physics and Automation blog
  • Subscribe Subscribed
    • Factory Physics and Automation blog
    • Join 115 other subscribers
    • Already have a WordPress.com account? Log in now.
    • Factory Physics and Automation blog
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...