It has been a while, but summer in upstate NY is too beautiful to not enjoy it as much as possible. Downside is (at least for the blog) – I spend less time on the computer to write new posts.
So instead posting about Factory Physics and Automation topics, I do more of this:





Later in fall there will be more time again for writing – for the time being just a very short post today.
There were 2 very nice articles written, referring to earlier posts from my blog and I think they are well worth the time reading:
Factory Size and how to benefit from it using advanced MES functionality – an article from Critical Manufacturing: LINK
Flexciton looks a bit more into the challenge of load port scheduling and load port utilization as a performance indicator: LINK
Enjoy the summer !
to get automatically notified about new posts:
Great photos, Thomas! Enjoy your summer, too. Thanks for the links!
LikeLike