Skip to content

Factory Physics and Automation blog

to share and discuss experiences in the field of semiconductor manufacturing operations and automation

Maintenance in the era of Industry 4.0

November 29, 2025November 29, 2025 Leave a comment

I recently run into a very nice article written by Jeff Winter – discussing the evolution of maintenance approaches. I thought it is absolutely worth sharing here. Thank you Jeff for giving me permission to do so. More interesting articles by Jeff can be found here:https://www.jeffwinterinsights.com/ Please see the article here: MaintenanceDownload

Legacy FAB Automation Maturity Framework

October 14, 2025October 14, 2025 Leave a comment

In the last 3 months there was a working group under the umbrella of SEMI working on a Maturity Framework – and the 1st results were presented at the SemiCon West last week in Phoenix, AZ. I had the opportunity to contribute to this work. The attempt is to give existing 200mm Wafer FABs an…… Continue reading Legacy FAB Automation Maturity Framework

Posts pagination

Previous page Page 1 Page 2 Page 3 … Page 24 Next page
  • Humanoids in Wafer FABs – poll results
  • Humanoid Robots in Wafer FABs ?
  • Maintenance in the era of Industry 4.0
  • Legacy FAB Automation Maturity Framework
  • Results of FAB Automation 2025 survey
  • State of Semiconductor FAB automation in 2025
  • Importance of carrier location tracking – part 2
  • Innovation Forum for Automation 2025
  • Good Bye 2024 – Hello 2025 !
  • AI enabled precision maintenance
  • Importance of carrier location tracking – part 1
  • Test Wafer, part 3
  • Test Wafer, part 2
  • Test Wafer , part 1
  • ASMC 2024
  • THANK YOU 2023
  • Maintenance and FAB productivity
  • Impact of “time links” or controlled queue times
  • MES & Industry 4.0 Summit in Porto, Portugal
  • ASMC 2024 – call for papers
  • MES Summit in Porto, Portugal
  • 2024 Innovation Forum for Automation
  • Data is the new oil – or is it skilled workforce ?
  • ASMC 2023
  • Product Mix and FAB performance
  • Rework and FAB cycle time
  • Equipment Uptime and FAB speed, part 3
  • Equipment Uptime and FAB speed, part 2
  • Equipment Uptime and FAB speed, part 1
  • Summertime (Blog) Blues
  • 19th Innovation Forum for Automation
  • Wafer FABs – how many are there ?
  • Fab cycle time and capacity planning
  • US Semiconductor Ecosystem Outlook
  • View into a FAB
  • Equipment load port utilization vs. FAB speed
  • Wafer FAB – size does matter !
  • The value of 1 day of factory cycle time
  • Chip shortage and FAB performance, part 3
  • Chip shortage and FAB performance, part 2
  • Chip shortage and FAB performance, part 1
  • Bottlenecks – download
  • Bottlenecks, final part
  • Bottlenecks, part 3
  • Bottlenecks, part 2
  • Bottlenecks, part 1
  • Hello
A WordPress.com Website. Factory Physics and Automation blog
  • Subscribe Subscribed
    • Factory Physics and Automation blog
    • Join 115 other subscribers
    • Already have a WordPress.com account? Log in now.
    • Factory Physics and Automation blog
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...