I like to resume with the posts on the topic of FAB cycle time drivers. As mentioned in an earlier post – these are some of the key drivers for factory cycle time: overall factory size (number of equipment available to run a certain step) overall equipment uptime and uptime stability M-ratio rework rate product…… Continue reading Equipment Uptime and FAB speed, part 1
Summertime (Blog) Blues
It has been a while, but summer in upstate NY is too beautiful to not enjoy it as much as possible. Downside is (at least for the blog) – I spend less time on the computer to write new posts. So instead posting about Factory Physics and Automation topics, I do more of this: Kayaking…… Continue reading Summertime (Blog) Blues