Skip to content

Factory Physics and Automation blog

to share and discuss experiences in the field of semiconductor manufacturing operations and automation

Category: Uncategorized

Chip shortage and FAB performance, part 2

January 23, 2022February 4, 2022 Leave a comment

Reflecting on the wide spread of acceptable wait times and therefore acceptable FAB cycle times from the poll results, I was wondering: Why do people have these different opinions. I think it has to do with the actual factory conditions, the individual voters have experienced in their professional careers. To have fast cycle times is…… Continue reading Chip shortage and FAB performance, part 2

Chip shortage and FAB performance, part 1

January 15, 2022 4 Comments

I like to be open – I could not resist to use the trendy “chip shortage” term to generate some interest. Everything I will discuss in this post series is of course fully applicable even in times without a chip shortage. Let’s start with the results of my last poll: The spread of the answers…… Continue reading Chip shortage and FAB performance, part 1

cycle timeFAB performance

Posts navigation

Previous Posts
Next Posts
  • AI and the intelligent Factory
  • Humanoids in Wafer FABs – update
  • Legacy FAB Automation Maturity – Update
  • Humanoids in Wafer FABs – poll results
  • Humanoid Robots in Wafer FABs ?
  • Maintenance in the era of Industry 4.0
  • Legacy FAB Automation Maturity Framework
  • Results of FAB Automation 2025 survey
  • State of Semiconductor FAB automation in 2025
  • Importance of carrier location tracking – part 2
  • Innovation Forum for Automation 2025
  • Good Bye 2024 – Hello 2025 !
  • AI enabled precision maintenance
  • Importance of carrier location tracking – part 1
  • Test Wafer, part 3
  • Test Wafer, part 2
  • Test Wafer , part 1
  • ASMC 2024
  • THANK YOU 2023
  • Maintenance and FAB productivity
  • Impact of “time links” or controlled queue times
  • MES & Industry 4.0 Summit in Porto, Portugal
  • ASMC 2024 – call for papers
  • MES Summit in Porto, Portugal
  • 2024 Innovation Forum for Automation
  • Data is the new oil – or is it skilled workforce ?
  • ASMC 2023
  • Product Mix and FAB performance
  • Rework and FAB cycle time
  • Equipment Uptime and FAB speed, part 3
  • Equipment Uptime and FAB speed, part 2
  • Equipment Uptime and FAB speed, part 1
  • Summertime (Blog) Blues
  • 19th Innovation Forum for Automation
  • Wafer FABs – how many are there ?
  • Fab cycle time and capacity planning
  • US Semiconductor Ecosystem Outlook
  • View into a FAB
  • Equipment load port utilization vs. FAB speed
  • Wafer FAB – size does matter !
  • The value of 1 day of factory cycle time
  • Chip shortage and FAB performance, part 3
  • Chip shortage and FAB performance, part 2
  • Chip shortage and FAB performance, part 1
  • Bottlenecks – download
  • Bottlenecks, final part
  • Bottlenecks, part 3
  • Bottlenecks, part 2
  • Bottlenecks, part 1
  • Hello
A WordPress.com Website. Factory Physics and Automation blog
  • Subscribe Subscribed
    • Factory Physics and Automation blog
    • Join 118 other subscribers
    • Already have a WordPress.com account? Log in now.
    • Factory Physics and Automation blog
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...